Saturday, December 22, 2007

Open House!

We're having an open house on December 30th, from 2:00 pm until 8:00. Stop by and say hi!

Directions from Waterloo: North on King, past the market. As you approach town, your first right is Printery. Then take your first left (Maplelawn) and Treeview is the second right. Drop in any time between 2 and 8. Hope to see you then!!

If you get lost, call us - (519) 664-0552.

Thursday, November 29, 2007

Island top finally!




The quartz top finally arrived today. Here are some pictures:

Tuesday, November 13, 2007

Walkthrough, etc.

We did the walkthrough on Monday and everything looked good. There were a few things that needed to be addressed, but they were all minor.

We get the keys tomorrow and start the moving process. We will likely sleep there Friday night.

Friday, November 9, 2007

Not Much

We went over yesterday and they hadn't really done much. The painter finished the little things, and I think they capped off the central vac ports. They still have a lot to do: insulate and put vapour barrier on the entire basement, rough in the central vac to the garage, clean the entire place, install the microwave, fix the issue with the hole in the cold cellar being too close to the gas meter (less than 3 feet - duh, parging on the foundation, place all the vents, and probably a few other things that we haven't noticed.

Tuesday, November 6, 2007

Almost ready




Today they installed most of the carpet and the rest of the lights. The lights were working which made it a lot easier to get around.

Friday, November 2, 2007

Electrician was in today

Here's the master bathroom cabinet with the trim, hall light, the girls' bathroom with light and sink, kitchen with trim, and the kitchen sink.



Thursday, November 1, 2007

No pictures (forgot the camera today) but...

The plumber was in today and installed all the toilets, sinks and fixtures, and the water's on. The siding is done and the gas roughins are complete (range and dryer). I didn't notice the one for the bbq, but I did see the cutoff in the basement for it.
The microwave has arrived. At the house, the insulation truck was there to fill the attic, the bricklayers put the final stone below the front door, the siding guy has placed the pillars and is almost done all the siding.

We noticed that he was putting the pillars in the wrong place. Apparently he wasn't told that we wanted one less pillar, so he was going by the original plan. Good thing I was there to tell him otherwise. Sheesh.

Wednesday, October 31, 2007

Kitchen tops installed, bathroom fixed

The tile guy fixed his error - although he told my dad that "the homeowner changed his mind". nice try - I spoke with the sales rep at the flooring company and he was dissapointed that the installer messed up - he said he went over it with him a couple times. Ugh.

Also, this is the kitchen without the crown moulding at the top, and also without the island. The island will be installed once we're in the house. It will be 4 feet by 10 feet and will have a sink and a beverage fridge in it, with a quartz top.

Tile error

The tiles pictured below have an error - there is supposed to be mosaic tile on the skirt part instead of just at the top. I mentioned it to Bernie at Brodrechts and they're going to fix it.