Wednesday, October 31, 2007

Kitchen tops installed, bathroom fixed

The tile guy fixed his error - although he told my dad that "the homeowner changed his mind". nice try - I spoke with the sales rep at the flooring company and he was dissapointed that the installer messed up - he said he went over it with him a couple times. Ugh.

Also, this is the kitchen without the crown moulding at the top, and also without the island. The island will be installed once we're in the house. It will be 4 feet by 10 feet and will have a sink and a beverage fridge in it, with a quartz top.

Tile error

The tiles pictured below have an error - there is supposed to be mosaic tile on the skirt part instead of just at the top. I mentioned it to Bernie at Brodrechts and they're going to fix it.

Tuesday, October 30, 2007

Monday, October 29, 2007

More new stuff

Here's the desk without the top cabinet, a picture of a door against the stained fireplace. They match not too badly. Below that is the master bathroom cabinets with the doors on. The stain colour looks different depending on the angle and the location of the flash. The picture of the desk is pretty close.

Also, the bricks are almost done and the siding is started. They still have a lot to do in the next 15 days...

Sunday, October 28, 2007

Went in today - cabinets

Here is Avery and Fiona's bathroom, the master ensuite and Madeline and Isaac's bathroom.



Better shot of the kitchen in daylight

Friday, October 26, 2007

Kitchen



Ang was able to sneak in while they were working today and take a couple pictures.

Thursday, October 25, 2007

Fireplace


The fireplace was installed today, and the rooms that get cabinets (kitchen, bathrooms) have the finished coat of paint. Our bedroom and Isaac's room also have finished paint.

The bricks are done along the back and the one side of the house, with the other side of the house being about 1/3 done.

Wednesday, October 24, 2007

Minor developments today







The painter was in and did touchup work on all the walls, including added drywall compound to the areas that needed it. He also painted the top part of the wall in the kitchen. Someone added the kick-sweep to the floor as well - sounds like they're getting ready to install the cabinets.

More bricks were done today - not too happy with the attention to detail however.

Tuesday, October 23, 2007

Today's Progress




They added some drywall to the stairwell downstairs, grouted the tiles, and tiled and grouted the bathroom floor. No bricks because of the rain. Apparently Blogger doesn't want me to upload images right now.

Monday, October 22, 2007

Tiles and Bricks




The tile is done on the main floor (no grout yet), and the bricks have a healthy start at the back of the house.

Kids



















The kids had a look around yesterday and Madeline took a couple great pictures.

Also, they're helping us pack.

Saturday, October 20, 2007

Railing, Flooring

On friday they installed the railing - it looks great. The stain will be close to the cabinet colour. We have some lovely models assisting with the presentation here.

I laid out a couple tiles as they will be placed on the floor. I bet they start Monday (if not tomorrow).

Thursday, October 18, 2007

Paint



The painters did in fact paint today. Ang and I went in and took some pics of the colour. We're likely going to paint a number of rooms almost right away, but hopefully this colour will be livable for now.

Tuesday, October 16, 2007

Pics of painted doors


This is the studio closet. You can see the painted doors here. Hopefully they paint the walls tomorrow and the flooring can start.

Holy Smokes

Yesterday I went in and saw that they had hung all the doors and put up all the trim, except for the trim where there will be tile. They also drywalled the garage.

I drove by today and saw that there were painters in. I think they've painted all the doors and trim. I'll go in tonight and see if I can take pictures. Also, they have the scaffolding up for the bricks. I suspect they'll be starting soon.

Saturday, October 13, 2007

Doors, Trim and Ceiling



The doors and trim are in the living room, and the ceilings have been textured!

The plan

In case anyone hasn't seen the plan, here it is:

http://www.lehmo.net/stuff/9Electrical.073007.pdf

Here is the original. We modified it a lot:

http://bromberghomes.com/Content/JacobsTrail/Smith/Handout.pdf

Bricks are delivered


The bricks were delivered last week and I suspect they'll start Monday. The doors and trim were delivered today as well. The drywall still needs to be sanded I think.

Wednesday, October 10, 2007

Went by today....

The bricks are in the front yard. That's a good sign I think. The drywall mudders are basically done and I think they are going to sand tomorrow. I love it when they leave the back door unlocked.

Monday, October 1, 2007

New pics today

Here are the colour selections for the kitchen. The tile and door are visible, and the dark stone is the quartz that we will have on the island, and the other piece is the counter top we will have on the other cabinets.











The drywallers left the door open today so I snuck in and took some pictures. Here's the bathroom - there will be some cool tile work around the tub.











Here's the kitchen. It doesn't look like much yet.